The leadership team at MaxCon/SVR brings a wealth of experience from the construction industry, with a diverse background spanning both Korea and the United States.
MaxCon/SVR’s integrated design-build methodology delivers substantial advantages to its clients, as it provides all services from the start to the finish of the project under a single point of responsibility. Here are the key services we provide to our clients throughout the project:
1.Project Understanding: Assess the preliminary designs for compliance with US building codes, regulations, and standards, etc. Align the design intentions with the Korean Architecture & Engineering teams. Evaluate the owner’s requirements and set guidelines for the teams to comply with US standards.
2. Project Coordination: Spearheads the development of the preliminary design, collaborating with top professionals and contractors to meet the owner’s requirements and design intent. This multidisciplinary approach ensures a holistic and integrated design process, delivering optimal results for every project. This involves a comprehensive team of experts from various fields, including but not limited to: Architecture, Civil, Structural, Mechanical, Electrical, Plumbing, Fire Protection, Fire Alarm, Logistics, Vertical Transportation, IT, Audio Visual, Lighting, Landscape, Acoustics, Vibration, Security, Sustainability, Expeditor etc.
3. VE: Implement value engineering to enhance the efficiency of the building systems, along with exploring alternatives to reduce project costs and duration.
4. BIM: Incorporate BIM during the development stage to enhance productivity, decrease costs and shorten project duration, and to facilitate real-time design
. Coordination with Korean A/E teams.
. System
Optimization:
. Improved
Constructability
. Error
Minimization:
. Clash
Detection:
. Potential
Revisions Minimization:
. Enhanced
Collaboration and Communication:
. Model-Based
Cost Estimation:
. Project
Visualization in Preconstruction:
. Reduced
Waste:
. Increased
Productivity: etc.
5. Fast-track: Implement a fast-track strategy with construction teams to enhance time efficiency and cost savings. This approach allows for overlapping design and construction phases, leading to a shorter project timeline and reduced overhead costs. It also offers flexibility for making changes during the construction process and enables earlier utilization of the completed project.
6. Permitting: Obtain all necessary permits and approvals required for the construction project as a single source. MaxCon/SVR is confident in securing the necessary permits, even when implementing fast-track strategies, due to their extensive project experience in the US.
7. Construction Management: Oversee all aspects of the construction process, including site preparation, foundation work, framing, installation of mechanical systems, finishing work, and cleanup. Ensure seamless coordination among the Owner, Architecture/Engineering Teams, and Contractors throughout the entire project lifecycle. Facilitate coordination between various trades as a team.
8.
Technology: Establish a fully digital and data-driven delivery platform
to decrease costs, reduce waste, and shorten the project timeline.
9. Cloud-base Management: Implement cloud-base management software for efficient communication and cost savings. This will allow
. real-time communication with
Korean stakeholders.
. Enhanced
Collaboration and Communication:
. Streamlined
Project Management:
. Improved
Document Management: (Contract Documents, RFIs, Submittals, ASKs, ASIs, NCR
etc.)
. Quality
Assurance and Safety Compliance:
. Mobile
Accessibility:
. Cost
Control and Financial Management:
. Scalability
and Flexibility: etc.
10. QA/QC: Implement a Quality Control, Quality Assurance program to ensure that all work is performed in accordance with the design plans and specifications.
11. Safety: Implement
a safety program to ensure the health and safety of all workers on the
construction site.
12. Schedule: Develop and maintain a detailed construction
schedule, and ensure that all work is completed on time.
13. Budget: Develop and maintain a detailed construction
budget, and ensure that all work is completed within the budget.
14. Communication: Maintain regular communication with the owner and other stakeholders, and provide regular updates on the progress of the construction project. Innovative online communication tools will be utilized to facilitate efficient communication, enabling participants from all around the world to engage effectively. MaxCon/SVR provides staff who are fluent in two languages and have a deep understanding of both cultures, ensuring effective communication.
15. Closeout: Upon completion of the construction project, provide all necessary documentation for closeout, including as-built drawings, warranties, and operation and maintenance manuals.