> > PROJECT SOLUTIONS > MAINTAIN THE CONTROL AND VISIBILITY YOU NEED

MAINTAIN THE CONTROL AND VISIBILITY YOU NEED

The leadership team at MaxCon/SVR brings a wealth of experience from the construction industry, with a diverse background spanning both Korea and the United States.

 

Their expertise has been refined through their tenure at prestigious firms such as Turner and SOM, further enhancing their ability to deliver exceptional results. Utilizing the latest technology and skills, MaxCon/SVR ensures an efficient construction process, optimizing results and client satisfaction. They also employ cutting-edge technologies to enhance coordination and collaboration, enabling seamless connections between individuals, regardless of location, and reducing the need for in-person meetings. The technology suite encompasses a majority of the world’s premier software and hardware, supported by a wealth of skilled professionals.

MaxCon/SVR’s integrated design-build methodology delivers substantial advantages to its clients, as it provides all services from the start to the finish of the project under a single point of responsibility. Here are the key services we provide to our clients throughout the project:

1.Project Understanding: Assess the preliminary designs for compliance with US building codes, regulations, and standards, etc. Align the design intentions    with the Korean Architecture & Engineering teams. Evaluate the owner’s requirements and set guidelines for the teams to comply with US standards.

 

2. Project Coordination: Spearheads the development of the preliminary design, collaborating with top professionals and contractors to meet the owner’s        requirements and design intent. This multidisciplinary approach ensures a holistic and integrated design process, delivering optimal results for every project. This involves a comprehensive team of experts from various fields, including but not limited to: Architecture, Civil, Structural, Mechanical, Electrical, Plumbing, Fire Protection, Fire Alarm, Logistics, Vertical Transportation, IT, Audio Visual, Lighting, Landscape, Acoustics, Vibration, Security, Sustainability, Expeditor etc. 

 

3. VE: Implement value engineering to enhance the efficiency of the building systems, along with exploring alternatives to reduce project costs and duration.

 

4. BIM: Incorporate BIM during the development stage to enhance productivity, decrease costs and shorten project duration, and to facilitate real-time design 


. Coordination with Korean A/E teams.

. System Optimization: 

. Improved Constructability

. Error Minimization: 

. Clash Detection:

. Potential Revisions Minimization: 

. Enhanced Collaboration and Communication:

. Model-Based Cost Estimation: 

. Project Visualization in Preconstruction: 

. Reduced Waste: 

. Increased Productivity: etc.

 

5. Fast-track: Implement a fast-track strategy with construction teams to enhance time efficiency and cost savings. This approach allows for overlapping design and construction phases, leading to a shorter project timeline and reduced overhead costs. It also offers flexibility for making changes during the construction process and enables earlier utilization of the completed project. 

 

6. Permitting: Obtain all necessary permits and approvals required for the construction project as a single source. MaxCon/SVR is confident in securing the necessary permits, even when implementing fast-track strategies, due to their extensive project experience in the US.

 

7. Construction Management: Oversee all aspects of the construction process, including site preparation, foundation work, framing, installation of mechanical systems, finishing work, and cleanup. Ensure seamless coordination among the Owner, Architecture/Engineering Teams, and Contractors throughout the entire project lifecycle. Facilitate coordination between various trades as a team. 

 

8. Technology: Establish a fully digital and data-driven delivery platform to decrease costs, reduce waste, and shorten the project timeline.

 

9. Cloud-base Management: Implement cloud-base management software for efficient communication and cost savings. This will allow 

. real-time communication with Korean stakeholders. 

. Enhanced Collaboration and Communication: 

. Streamlined Project Management: 

. Improved Document Management: (Contract Documents, RFIs, Submittals, ASKs, ASIs, NCR etc.)

. Quality Assurance and Safety Compliance: 

. Mobile Accessibility: 

. Cost Control and Financial Management: 

. Scalability and Flexibility: etc.

 

10. QA/QC: Implement a Quality Control, Quality Assurance program to ensure that all work is performed in accordance with the design plans and specifications.


11. Safety: Implement a safety program to ensure the health and safety of all workers on the construction site.

 

12. Schedule: Develop and maintain a detailed construction schedule, and ensure that all work is completed on time.

13. Budget: Develop and maintain a detailed construction budget, and ensure that all work is completed within the budget.

14. Communication: Maintain regular communication with the owner and other stakeholders, and provide regular updates on the progress of the construction project. Innovative online communication tools will be utilized to facilitate efficient communication, enabling participants from all around the world to engage  effectively. MaxCon/SVR provides staff who are fluent in two languages and have a deep understanding of both cultures, ensuring effective communication.

15. Closeout: Upon completion of the construction project, provide all necessary documentation for closeout, including as-built drawings, warranties, and operation and maintenance manuals.